
ReadyMix
- Every load recorded
- The grade, volume and the time each load left the plant.
- Controlled water
- Any water added on site is recorded against the load.
- Cube testing
- Cubes are tested to 28 days and the results traced to the load.
Products
What we supply
Prices depend on quantity and distance to site. Tell us both and we will quote a delivered price.
Structural grades
C20 to C35 for slabs, columns, beams and foundations.
Blinding and mass fill
Lean mixes for blinding, mass fill and kerb beds.
Pumpable mixes
Designed for pumping to upper floors and restricted sites.
Designed mixes
Batched to your engineer's specification.
Also available
- ReadyMix C25 (per cubic metre)
Ordering
How to order
- 1
Send your requirements
Call, message us on WhatsApp or use the enquiry form. Tell us the materials, quantities, site location and dates.
- 2
Receive a quotation
We send a written quotation with delivered prices and VAT shown separately.
- 3
Confirm and schedule
Once you confirm, we book deliveries, pours or hire dates around your programme.
- 4
Delivery and invoicing
Deliveries and hires are charged to your account, with one statement across all divisions.
FAQ
Common questions
How much notice do you need for a pour?
Two to three working days is ideal. Tell us the volume, grade, site location and start time.
How is quality recorded?
The batching time and slump of each load are recorded. Cubes are taken and tested, and results are kept against the loads they came from.
Can you pump?
Tell us about the pour and we will advise on the mix and placing method.
Other divisions


